HOME/ PROJECT / LED LIGHTING @ MELAKA GENERAL HOSPITAL
LED LIGHTING @ MELAKA GENERAL HOSPITAL
Date: September 2017
Categories: Indoor LED Luminaire
LED Vision takes pride in its extensive experience and successful completion of numerous project installations within Malaysia. One such notable project was the installation of LED lighting at Melaka General Hospital. With a focus on energy efficiency and superior illumination, LED Vision was the perfect choice for this endeavor.
The Melaka General Hospital installation aimed to enhance the lighting system throughout the facility, ensuring a conducive environment for both patients and medical professionals. LED Vision’s expertise and dedication to delivering exceptional results made them the preferred partner for this project.
By utilizing state-of-the-art LED technology, LED Vision successfully transformed the hospital’s lighting system. The integration of LED lighting not only improved the overall brightness but also provided substantial energy savings, reducing the hospital’s carbon footprint. This installation marked a significant milestone in the hospital’s journey towards sustainability and cost-efficiency.
LED Vision’s team of skilled professionals meticulously planned and executed the project, ensuring minimal disruption to the hospital’s daily operations. Their expertise in lighting design and project management allowed for a seamless transition to the new lighting system. The installation process adhered to strict safety regulations and quality standards, guaranteeing the longevity and reliability of the LED lighting solution.
The collaboration between LED Vision and Melaka General Hospital resulted in a visually appealing and well-illuminated healthcare facility. The enhanced lighting not only created a comfortable and welcoming ambiance but also contributed to the overall well-being of patients and staff.
LED LIGHTING @ MASJID KAMPUNG GANGSA, DURIAN TUNGGAL
HOME/ PROJECT / LED LIGHTING @ MASJID KAMPUNG GANGSA, DURIAN TUNGGAL
LED LIGHTING @ MASJID KAMPUNG GANGSA, DURIAN TUNGGAL
Date: March 2019
Categories: Indoor LED Luminaire
Masjid Kampung Gangsa’s interior now radiates with brilliance, thanks to our top-selling LED 150W High Bay G4 series. The selected high bay, complete with an optional 90D Cone, has transformed the mosque, setting a new standard in illumination. The project’s primary goal was to achieve a uniform and comfortable lighting effect throughout the mosque area, enhancing the ambiance for worshippers.
Our LED 150W High Bay G4 not only meets but exceeds these objectives, ensuring a well-lit and welcoming environment. The optional 90D Cone adds versatility to cater to specific lighting needs. This installation not only aligns with our commitment to cutting-edge lighting solutions but also contributes to a serene and conducive atmosphere for spiritual reflection within Masjid Kampung Gangsa.
LED LIGHTING @ KEMENTERIAN KERJA RAYA MALAYSIA (KKR)
HOME/ PROJECT / LED LIGHTING @ KEMENTERIAN KERJA RAYA MALAYSIA (KKR)
LED LIGHTING @ KEMENTERIAN KERJA RAYA MALAYSIA (KKR) BLOCK A & B
Date: 2018 Categories: LED Lighting
Kementeriaan Kerja Raya (KKR) is located at Jalan Sultan Salahuddin, Kuala Lumpur opposite the new JKR building office. Also called the Ministry of Works, the buildings designated as Block A and Block B houses the Minister and Deputy Ministers of works and their staff. In 2017, as part of the government initiative to reduce energy consumption and to upgrade older government assets, a tender was issued by to upgrade all lighting in Block A and Block B to LED lighting.
The initiative was funded by the government through KeTTHa, the Ministry of Energy, Green Technology and Water, audited by the Energy Commission (ST). The project was facilitated by the Department of Works (JKR) with the specifications and requirements provided by the Electrical Department in JKR.
10,000 lighting points was upgraded to LED. The challenge was to create a multiple lumen output product not controlled by a centralised dimming system. Each light must have individual controls and are able to manual operated by the tenants. The other concern was that the lighting products must be easily removable without tools but yet made to be used only for the fittings in KKR. Finally JKR understood that this custom made products will require certifications to be run concurrently while delivery and installation was proceeding. The initial mock up and testing created the baseline for the brightness of the product at multiple areas ie: factory setting. Post-installation the maintenance team assisted the tenants in either increasing the brightness or reducing it.
We are heartened to see the efforts and government initiatives in going green and conserving energy. We wish to congratulate KKR and JKR for the successful implementation of LED lighting in this project.
LED LIGHTING @ INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA (UIAM), GOMBAK
HOME/ PROJECT / LED LIGHTING @ INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA (UIAM), GOMBAK
LED LIGHTING @ INTERNATIONAL ISLAMIC UNIVERSITY MALAYSIA (UIAM), GOMBAK
Date: 2018 Categories: LED Lighting
International Islamic University Malaysia (IIUM) main campus is at Gombak Kuala Lumpur which houses are 8 faculties. Under a performance contract, the traditional lighting was upgraded to LED lighting. The clients planned to apply energy saving methods in the university.
The scope of the work was to manufacture & install the T8 LED tube lights in the university. For this project, the T8 LED tube light to replace was 42,000 units. The clients gave four months to complete this lighting project. The challenge was to store the product on site. The solution is to store 2 shipments of LED tube lights in a 40 feet container. Another challenge at that time was to install during and around working hours which classes, offices and the library was occupied. Access to some area was restricted to Saturdays. All installation work was done with the presence from the clients and the maintenance team. Every day, documentation was updated to identify the quantity installed and the locations. Every single tube was identified by zone and serial number.
Apart from some site delay, difficulty to access some areas, the project was completed in good time. The targets have been achieved, and IIUM experienced significant reduction in energy and maintenance cost. The impact of the change is clearly noticeable, with improvement of in all areas of illumination. The maintenance costs have been reduced as a result of the modernization, and IIUM took a significant step to be environmentally friendly.
HOME/ PROJECT / LED LIGHTING @ HONDA MALAYSIA SDN. BHD. MELAKA HOSPITAL
LED LIGHTING @ HONDA MALAYSIA SDN. BHD. MELAKA
Date: 2018 Categories: LED Lighting Items: LED Hi-Mast
Our latest contribution to the automotive industry in their security and storage component is the changing of their 1000W metal halide floodlights to the 400W AdvanLED LED hi-mast lighting. The overal size of the project are the setting of this project was a parking lot of 140,000 square meters. The quantity of lighting is 14 lamps for every 25 meter pole in a circular configuration.
The clients wished to improve on the lighting products used in several aspects, such as the lifetime and reliability of energy consumption. However, unexpectedly the most expensive reason is the presence of birds hitting the conventional lighting casing, which is coverd in glass and causing breakage. The falling glass damages the cars parked in the area making them no good for sale.
The solution was to simulate the required brightness, layout and angle of the lights based on the area of coverage. Using 10 units of 400W AdvanLED hi-Mast lighting to per pole for a total of 100 units. We were able to achieve the desired lux levels and even distribution for security camera visibility.
The result was easily capture on security cameras as a marked improvement on the lighting performance. Expected ROI from savings and usage was 1.5 years. Expected lifetime based on usage is 15 years.
Honda Malaysia Sdn. Bhd.